Base Prep & Leveling Pad Installation

Guide

Installation Steps

Base Prep & Leveling Pad

Base Prep & Leveling Pad Installation

Call Before You Dig websites and toll free numbers can be found around the world. Their purpose is to prevent someone from digging up dangerous gas lines or power lines and are highly recommended before beginning any retaining wall project.

STEP

01

01

Planning Your MagnumStone Retaining Wall

Proposed Wall Location

Grass

Retained Soil Zone

Sub Base Zone

Proposed Wall Location

Grass

Reinforced Backfill Zone

Organic Materials

Quick Steps
  • Mark the bottom and top of the wall excavation location with spray paint or stakes.

  • Establish proper elevation at the bottom and top of wall before excavating.

  • Organic materials should not be used in Reinforced Backfill Zone.

  • Store and protect Backfill Materials from inclement weather during construction.

  • Mark the bottom and top of the wall excavation location with spray paint or stakes.

  • Establish proper elevation bottom and top of wall before excavating

  • Store and protect Reinforced Backfill Materials from inclement weather during construction

Top
STEP

02

02

Excavation of Subbase & Leveling Pad Trench

Back of Wall Excavation Depth

Excavation Cut Line

Retained Soil

Excavated Materials

Quick Steps
  • Excavate and prepare Subbase Leveling Trench 6” (15.25 cm) below first course.

  • For the Leveling Pad Trench, excavate approximately 3.5’ to 4’ wide (106.7 cm to 122 cm).

  • To achieve a normal retaining wall burial depth or embedment depth, excavate 6” to 12” (15.25 cm to 30.5 cm).

  • Base leveling pad trench should extend a minimum of 6” (15.24 cm) in front of where the MagnumStone base block’s face will be located and should also include 6” (15.24 cm) behind the block (or last extender unit of the base course if gravity extender units are being used).

  • Excavate cut line behind the retaining wall leveling pad trench to a 2:1 slope ratio or greater *Ensure you follow local OHS | Occupational Health and safety standard in your region*.

  • Excavate and prepare Sub Base Leveling Trench 6” below first course.

  • Normal wall Burial Depth or Embedment Depth is 6” to 12”.

  • Excavate cut line to a 2 to 1 slope or greater.

  • Back of wall excavation depth into the bank should be 12” beyond the back of the Sub Base Leveling Trench.

Top
STEP

03

03

Subbase Compaction

Compactor

Retained Soil

Sub Base

Quick Steps
  • Compact subbase to 95% SPD Standard Proctor Density or greater.

  • For the Leveling Pad Trench, excavate approximately 3.5’ to 4’ wide Remove any organic or poor soils in the subbase and replace with proper Reinforced Fill Materials before compacting.

Top
STEP

04

04

Base Stabilization (optional)

Quick Steps

Leveling Pad Trench

Base Stabilization Fabric

Stabilization Fabric

Compacted Gravel +/- 6" Deep

MagnumStone™ Base Block

  • Base stabilization fabric is optional but will help separate subbase materials from leveling pad materials and provide extra structural bearing capacity to the base leveling pad.

  • Recommended to place base stabilization fabric on top of leveling pad trench overlapping the back and front for the length of the trench.

  • Ensure base stabilization fabric covers the leveling base trench, as well as the embedment area in front and behind the trench. This will prevent sub base materials from mixing with gravel base leveling pad during compaction.

Top
STEP

05

05

Rough Leveling Pad

6" [15.25 cm]

6" [15.25 cm]

6" [15.25 cm]

Quick Steps
  • Place well-graded gravel on top of fabric (if fabric is used) in the leveling pad trench approximately 6” (15.25 cm) deep.

  • Roughly grade gravel with a rake until it’s close to the finished base elevation.

  • Base leveling pad should extend 6” (15.25 cm) on both sides of the blocks. This includes beyond the back of the MagnumStone block or the back of gravity extender units, and a minimum 6” (15.25 cm) in front of the MagnumStone block’s facing.

Top
STEP

06

06

Compact Gravel Leveling Pad​

Quick Steps
  • Compact the gravel leveling pad to 95% Standard Proctor Density or greater.

  • Correct Moisture Content in the gravel will help in reaching proper compaction.

Top
STEP

07

07

Finished Leveling Pad

Quick Steps
  • Compact the gravel leveling pad front to back and side to side to the best and most level capability and to 95% Standard Proctor Density or greater.

  • Using tools and various methods is acceptable.

Top

Next Steps

Magnumstone Resources & Support

In addition to offering refined best practices, MagnumStone also provides support with respect to sales, customer support and technical resources. Discover more about how MagnumStone supports its Producers here: